New Booster Gym rendering from the Courtyard
Project Overview
Rebuilding of Booster Gym
Renovation of Names Gym
- Demolish existing Booster Gym: Construct new, seismicallysound Booster Gym as the school?¢‚Ǩ‚Ñ¢s primary venue for athletic and other large-scale events and activities. The Booster Gym is the largest and most used classroom on campus.
- Booster Gym Lower Level: Construct new boys?¢‚Ǩ‚Ñ¢ locker/shower areas. Also included on the lower level are classrooms, coaches?¢‚Ǩ‚Ñ¢ offices, training room, and changing rooms for officials.
- Booster Gym Upper Level: Install new flooring with concrete slab over metal decking (over bar joist), HVAC ductwork and light fixtures, and glazed exterior walls with aluminum front insulated with etched glass. Install new expandable bleachers, athletic equipment, and acoustical treatment. Enclose the ?¢‚Ǩ?ìlobby?¢‚Ǩ¬ù space at the eastern end of the two existing gyms with an extension of the gym roof framing.
- Fitness Center: A two-level Fitness Center, located at the west end of the facility, will have enough space for a full range of uses and equipment. This multi-level space is adjacent to the Training Room making it convenient as an educational space, training space, and fitness center.
- Names Gym: Renovate two-story wing at east end of building and renovate girls?¢‚Ǩ‚Ñ¢ locker/shower rooms. Lower level will house multi-purpose room, used for wrestling/physical education. Names Gym will be used primarily as a practice
gym.
Project Fact Sheet